"misa project" tag

At long last, MISA construction resumes

Almost two years since the brakes were applied, construction for the music instructional space and auditorium (MISA) project is back underway.

MISA funding moves on after surreal meeting

After a confusing, occasionally contentious and even surreal meeting, Wednesday night the BET voted by a seven to six margin to send consideration of funding for MISA onto the Representative Town Meeting.

Budget to be unveiled on Monday – Project advocates have last say

The town’s 2013-14 municipal budget is days away from being released and Monday night residents got a chance to campaign for items to be included in it as a future discussion about long-term financing appeared to get rolling.

© Hersam Acorn. All rights reserved. The Greenwich Post, 10 Corbin Drive, Floor 3, Darien, CT 06820

Designed by WPSHOWER

Powered by WordPress