"auditorium design" tag

School board faces tough choices after MISA bids come in high

After bids for the music instructional space and auditorium (MISA) project at Greenwich High School came in higher than expected, the Board of Education once again finds itself at a crossroads over the project.

© Hersam Acorn. All rights reserved. The Greenwich Post, 10 Corbin Drive, Floor 3, Darien, CT 06820

Designed by WPSHOWER

Powered by WordPress